From 1 - 2 / 2
  • GRT-2 is the second well drilled within the framework of the geothermal project ECOGI at Rittershoffen. The drilling of the well started in March 2014 and ended in July 2014. GRT-2 is a deviated well of 3196 m in length that reaches 2708 m TVD GL (true vertical depth from ground level) within the fractured granite basement. No reservoir enhancement was necessary at GRT-2. Production and circulation tests were realized from July to October 2014. The GRT-2 well is currently used as production well. It produces hot water at a temperature of 170 °C and with production flow rate of 70 L/s. Location of the GRT-2 wellhead (in WGS84): Latitude: 48.8970814354199° Longitude: 7.93865503246575°

  • GRT-1 is the first well drilled within the framework of the geothermal project ECOGI at Rittershoffen. The drilling of the well began at the end of September 2012. The well reached a final measured depth of 2580 m within the fractured granite basement at the end of December 2012. Hydraulic tests of the well were carried out from December 2012 to June 2013. The tests realized at GRT-1 allowed to increase its injectivity index by a factor five. The GRT-1 well is currently used as injection well. Location of the GRT-1 wellhead (in WGS84): Latitude: 48.8965633979049 Longitude: 7.93818621036716